Wednesday, December 8, 2010

Ngo To Work With Toronto

Calendar 2011 - classified site visits cavities

The schedule of outputs and ROQUEBLEU Lauzin for the year 2011.

Saturday, January 22 : ROQUEBLEU : free date

Saturday, February 19: Lauzin : CAF Roanne (42) - Group Manager: Lysiane V.

Saturday, March 19: ROQUEBLEU : PASSEPARTROU (34) - Group Manager: Anthony A.

Saturday, April 16: Lauzin : CDS 06 (Alpes-Maritimes) - Group Manager: Patrice T.

Saturday, May 21: ROQUEBLEU : Caving Club SOREZE (81) - Head of Group: Sylvie P.

Saturday, June 18: Lauzin : COURNONTERRAL Caving Club (34) - Head of Group: Guilhem D.

Saturday, July 23: ROQUEBLEU : CLPA (34) - Head of Group: Frederic S.

Saturday, September 17: Lauzin : CLPA (34) - Head of Group: Frederick S.

Saturday, October 22 : ROQUEBLEU : Caving Club TULLE - group responsible: Michel V.

Saturday, November 12: Lauzin Club?? - Group responsible: Pascal B.

Saturday, December 10 : ROQUEBLEU : free date

As you can see, there are two dates free Roquebleu, January and December. Any takers.

All requests to visit the cave Lauzin, will be waiting for 2012 .

Reminder: requests for visits must be received by email ( scmne1929@gmail.com ) Or mail ( SCMNE Avenue Occitan 34220 Courniou Caves ). I charge you as soon as possible. The secretary of

SCMNE
Denis Matarini


Wednesday, December 1, 2010

Kidneys, Ureterovesical Junction

Cave Trayolle - Release Sunday, November 23

Editor of the record: Patrick Cabrol

Participants:

Supervision: Patrick Cabrol
- Roger PARZYBUT and Guido DeBrock.
Participants: Brice GALERA (DREAL) - Séverine VERDIER - Arnaud GRAULT (DREAL) - Thibaud GRAULT - Henri PELLIET (DREAL) - Élodie SAHUET (ex DREAL) - Sarah BOURGOUIN (DREAL) - Jean Michel SOUBEYROUX.

Purpose: output initiation

Report:
  • We first headed to the area of skulls.
  • We have equipped the passage turns to the back of the walk (from Guy). We added 4 studs for better security.
We put a pin at the top of a handrail, a bolt for securing the double short descent of 4 meters, we then added two pins to place an extra string to descend to the bottom of the gallery. There should be 20 meters of rope in this place. The araldite

we put it a month ago, with Denis does not. It is probably too cold and wet, for the crystallization of the mixture of two products. We will come back with other means to permanently attach the mooring.
This does not pose a problem for the current security.

  • We then borrowed the ledge where the skulls are located, to reach the small well of 5 meters.
equipment in place with Denis is perfect, and it falls comfortably, 5 meters from the last wells. We added a bolt in the upper part of the descent at scree, to ensure the safety of the attendant to monitor the passage. The upstream
gours were filled with water and overflowed, it was super nice. (And then the photos !!!!)

  • We had lunch with two human skeletons, taken in calcite.
  • We got back from the ledge equipped before. This small loop circuit is very educational, and super easy for beginners.
  • We then headed to the big ramp, on the other side of the cavity. We replaced two dowels that we had missed, at the first output equipment with Denis.
The total descent of the inclined plane is 12 meters to the top until the first relay, and just 20 meters to the bottom. It takes a string of 40 meters to equip.

Note that we had taken a supplement, a string of "relief", which was used to assist in the raising of young Thibaub, which had no clip on his harness, to put a Crowl (harness child). He has also performed remarkably well in the rest of the cavity, and progressed as we all, without any difference, it's a good future recruit.

All the cavity was equipped with hooks, it would provide quick links from 10mm steel, for further events.

Atmosphere: very homogeneous group and knit. Super Output very nice ... all over again!

Equipment cavity to date (moorings in place):
  • UPSTREAM:
Descent into the scree s: 10 meter rope
Down the Well (shelf skulls ) 10 meters - a mickey at the wellhead.
Vire to rise from the gallery: 20 meters - to be fitted to go from the top.

  • DOWNSTREAM:
Grand incline: rope of 40 meters.

must 25 quick links.

We lack equipment group at the club. Ropes used for outings, it's perfect, but it remains up to standard PPE, ropes and the Lauzin Roquebleu (application pending at the DREAL for several weeks to months). Should buy 5 complete equipment (Boudria, Delta, descender, grips, pedals and Crowl).

missing equipment to the local club. It will see where he is.

Transcriber's Note:

damage, missing pictures.








Tuesday, November 30, 2010

How T Get Rid Of A Thumb Lighter Burn

Guy Gehin is no more. Bad news

The news came in late morning, Guy has gone in the morning, surrounded by her daughters, Karynne and Magali.
What's more, if it eventually suffer.
The religious ceremony will take place in the church Augmontel Thursday morning at 10am. A
all his family, sharing their sorrows Caving Club. We lose
a friend.

Monday, November 29, 2010

How To Write A Sponser Letter For A Wedding

J ose







love your fantasies and dreams
I love pink
The cherubim
Knights
And the ladies with eyes half closed

I love your "no!"
The gray and rain

A Loved beauty
We shall overcome
- I love your "yes" -
Our fears and our troubles

(To the faithful blog All the sculptures, you guessed it, are Patrick Cottencin)